Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Lacklustre Pothole Performance Highlighted By Survey

Thu, 10 Apr 2014

THE GOVERNMENT has got a long way to go to convince drivers that they have the pothole problem in control. That’s the view of 67 percent of motorists polled by road safety charity, the Institute of Advanced Motorists (IAM). According to the IAM’s survey, those respondents believe the government is doing a bad or a very bad job of maintaining the nation’s roads.

North East worst for road safety

Tue, 12 Nov 2013

THE NORTH EAST of England has the worst rates for deaths and serious injuries on England’s roads according to data from the Department for Transport. In 2012, the number of deaths and serious injuries in the North East increased by 8%, with an extra 65 incidents recorded compared to 854 in 2011. The South East of England, which suffered some of the worst statistics in 2011, is now the most improved region.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.